Sort by:[Date]

BUR2019 SPIN Highlights

 

Embedding request for Run17 54GeV NPE

 Embedding request for 54.4GeV NPE v2 analysis

Paper1_draft

 

Comments to UPC gamma-gamma -> e+e-

Weekly Meeting (Apr 22, 2019)

 ZZ: some new result

Run 15 BEMC Calibration: JP Trigger Un-Matching

 Attached are slides presenting highlights of the study into the process of removing tracks which point to jet patches that exceed JP1/JP2 thresholds.

Comments to pp elastic cross section

Paper1_diff_files

 

Slides for 04/19/2019 EPD Group Meeting

 

iTPC closeout review preparations

 

4/25 uploaded overview talk after walk tru this morning