Sort by:[Date]

HF minutes 2019/06/13

 1) NPE v2 at 54 and 27 GeV - Yuanjing Ji

QM2019 list of abstracts from Heavy Flavor PWG

TALKS:

ISMD Abstract

 

Embedding request for Run18 27 GeV NPE

 the bad run list is updated with the BMM issue:

BBC Curve Update

NPE status 0612

 

EPD Performance in 7.7 GeV

The discussion at the ops meeting was on how to increase the rate of good collisions.  One thought was to increase the EPD QT window, though this could then have a non-linear effect on the MIP&nb

FMS timeline 2015/2017 and triggers

2015

        - 16041049 - fms is moved to *closed* position

Production and trigger information for pp500_production_2017 (st_W)

2017 st_W

Reading PicoDst files with FMS data

In order to read the information from the branches without any additional STAR libraries, disable all other branches from the TTree and use SetMakeClass(1).