Sort by:[Date]

sTGC prototype n-Pentane procedure

Here is the document prepared to use n-Pentane in clean room.

Incident Angle Comparison Presentation

 8/1/19 - I have added an updated version of the previous presentation(finalPresentation.pdf) that includes a comparison of histograms.

Run 19 200GeV HLT-fast offline QA

 

p+Au Centrality

Run 15 BEMC Calibration: Systematics Studies

 Some updates from yesterday's meeting.

Run 19 EMC Timing

 Run 20191009
 

Some An Invesigations

Paper Proposal - A_N

Link to overall analysis compilation:
https://www.star.bnl.gov/protected/spin/bsumma/TSSAR15paper/AnalysisNoteLinks.pdf

Updated Reference material with fill list / count:

AuAu@27GeV full production QA

Attached is the QA plots for the AuAu@27GeV full production. The red lines on the run by run QA plots are Ave+/-5 \sigma.

Bulkcorr_0710_isobar_QA