Sort by:[Date]

Flow Decorrelation Error Projection for AuAu 200 GeV BUR

 

updates on different checking of "explore the nuclei deformation with mean transverse momentum and anisotropy flow in HI"

 systematics and additional checks 

STAR Shut Down Plan

 

lfsupc meeting

 Low-

Run 19 19.6 GeV BeamLine

I ran the BeamLine calibration codes on the picoDsts from the large calibration production for the Run 19 19.6 GeV data. I found a few oddities of note:

Run17 pp510 Jet QA

 

R correlator cross check

 

EPD nMipSum in quick QA in AuAu19.6GeV Run19

 

Presentation: BUR 2023-2025 proposal (6 Jul, 2020)

 

QA_19p6_BES2