Sort by:[Date]

MDC 2023

HPSS Tests performed 3/21/23 - 3/23/23

MDC 2023

HPSS Tests performed 3/21/23 - 3/23/23

MDC 2023

HPSS Tests performed 3/21/23 - 3/23/23

HP-2023 Poster

 

BES_II_updates

D0_RAA_draft

 

AnaNote_D0_Isobar

 

Checking EPD QTC -> DSM

Since we moved many of the QTCs around, we need to move the QT adapter cards in the back so that the QTCs are connected to the DSMs.  All East QTCs should go to EP001, all west QTCs should go to

Directed Flow of 4ΛH and 3ΛH in √sNN = 3.5 GeV Au+Au Collisions

 

Preliminary Plots for Energy-Energy Correlator Measurement in p+p Run12