Sort by:[Date]

Au+Au_Net_Baryon

 

Preliminary Request: v3 for Protons at 3.2, 3.5, 3.9 GeV

HP pwg20230808

 

Update phi distribution in Au+Au collisions and isobaric collisions

 

cmefg_hansheng_0804_updated

 

EPD Dark Current at the end of Run 23

Executive Summary

17p3GeV and dAu200 2021 dE/dx calibration

dE/dx calibration for 17p3GeV and dAu200 2021 have been put in MySQL  on 2023-08-04.

Cosmic FF runs after end of beam ops

 The TPC group had requested that a FF cosmic runs was done after end of beam op. As the RHIC beam ops was stopped on  Aug 2 the plan was put into place to execute this this

qm2023 readiness fcv

 So far we have received response from