Sort by:[Date]
Minutes for HF PWG meeting on 2014/8/28
Leszek: Update on Upsilon production in p+p 500 GeV run 11 (http://www.star.bnl.gov/protected/heavy/lkosarz/Upsilon_HF_LK_2014_8_28.pdf)
FPS FEE BUS CONTROL CCA (TUFF CARD) PCB gerber files sep_02_2014
Updated on Tue, 2014-09-02 16:41. Originally created by protected on 2014-09-02 16:40.- added OWB isolated pwr/ gnd planes
d+Au Ridge: Near-side / Away-side Yield Ratio Delta eta Dependence
This page is documentary purpose.
Motivation:
Background-issue
Background Estimation for run13 period one:
During the last W meeting both me and Jinlong presented Background Estimation for run 13 period 1.
Run 9 200GeV Dijet Data/Detector Level Simu Cut Order
There was a question raised about the jet eta / detector eta fiducial cut I place on my data ...