Sort by:[Date]

Minutes for HF PWG meeting on 2014/8/28

Leszek: Update on Upsilon production in p+p 500 GeV run 11 (http://www.star.bnl.gov/protected/heavy/lkosarz/Upsilon_HF_LK_2014_8_28.pdf)

FPS FEE BUS CONTROL CCA (TUFF CARD) PCB gerber files sep_02_2014

- added OWB isolated pwr/ gnd planes

Run12 Inclusive Jet A_LL Updates

 

Jet Meeting: Simulation Asymmetries

 

Trigger Study

 

d+Au Ridge: Near-side / Away-side Yield Ratio Delta eta Dependence

This page is documentary purpose.

 Motivation:

Background-issue

 Background Estimation for run13 period one:

During  the last  W meeting  both me and Jinlong presented Background Estimation for run 13 period 1.

Run 9 200GeV Dijet Data/Detector Level Simu Cut Order

There was a question raised about the jet eta / detector eta fiducial cut I place on my data ...

SSD geom : checking overlaps with ROOT

ACAT 14, final version