Sort by:[Date]

Preshower construction and installation

 Construction of the preshower quadrants
- frame
- scintillator wrapping
- layer gluing
- readout electronics
- preparation and installation of quadrants

Run15 Startup List

SSD residual

900 events

SPIN 2014 Proceedings

The current version of the proceedings is "v7".

Running list of updates:
v3: First copy to drupal. Includes first internal updates.

Request a new offline DB table for FMS reconstruction parameters

This is to request adding a new offline DB table to store 80 parameters related to FMS reconstrctions.
The layout of this table is very simple:

Spin 2014 proceedings

Run-11 Transverse Jets: Revisiting Trigger Bias

One of the last remaining tasks prior to publication is to revisit trigger bias for the new set of cuts.

Calibration status update for Run 14 AuAu datasets

  •  14.6 GeV AuAu

Away-side jet correlations 1216 2014

 

Run-11 Transverse Jets: Slides for PWGC Preview