- yezhenyu's home page
- Posts
- 2022
- April (1)
- 2021
- 2020
- 2019
- December (1)
- November (2)
- October (1)
- September (3)
- August (1)
- July (2)
- June (3)
- April (2)
- March (1)
- January (1)
- 2018
- 2017
- November (2)
- September (2)
- August (4)
- July (2)
- June (3)
- May (2)
- April (3)
- March (2)
- February (2)
- January (10)
- 2016
- December (3)
- November (2)
- October (2)
- September (3)
- August (3)
- July (1)
- June (1)
- May (2)
- April (2)
- March (2)
- February (3)
- January (2)
- 2015
- December (2)
- November (6)
- October (1)
- September (5)
- August (3)
- July (6)
- June (1)
- May (7)
- April (3)
- March (1)
- February (7)
- 2014
- 2013
- May (1)
- My blog
- Post new blog entry
- All blogs
Production Priorities Fall 2017
Production Priorities - Fall 2017
Proposed production priorities
- Fall 2017 - see Production Priorities Fall 2017
Past production priorities
- Spring 2017 - see Production Priorities Spring 2017
- Summer/Fall 2016 - see Production Priorities Summer2016
- Fall Winter 2015 - see Production Priorities Fall 2015
PWG Feedback:
Run17 Data Production Priority
PWG | p+p 510 GeV | Au+Au 54 GeV |
BulkCorr | st_physics (MB) | |
HF | st_physics, st_mtd | st_physics, st_mtd |
JetCorr | ||
LFSUPC | st_physics (MB) | st_physics (MB), st_mtd |
Spin/ColdQCD | 1st: st_W, 2nd: st_fms (but need complete pre- and post-shower alignment), 3rd: st_physics |
Spin/ColdQCD (Carl/Oleg): 1st priority is pp510 st_w data (StiCA and PPV_W for vertexing). Before FMS pre/post-shower alignment is completed: 2nd is pp510 st_physics (StiCA and PPV_W for vertexing), while after pre/post-shower alignment is completed: 2nd is pp510 st_FMS and 3rd is pp510 st_physics. Have interests in st_RP data as well but don't know the status of RP calibration and UPC vertex option.
BulkCorr (Bill/Jiangyong) request full production of Au+Au 54 GeV MB data with FMS before QM18. Would like to know the timeline for the calibration and production readiness, and have a 100M MB data produced with reasonable TPC and FMS calibration asap.
HF (Rongrong/Zhenyu): st_physics and st_MTD for pp510 and AuAu54
JetCorr (Kolja/Li): no additional manpower for Run17 data at the moment
LFSUPC (Chi/David): pp510 MB, AuAu54 MB and MTD
Jerome: AuAu54 calibrations will take at least 1.5 months (+2 weeks due to travel)
Carl/Oleg: StiCA and PPV_W for st_W and st_physics (agree by all PWGs? st_mtd?)
My proposed priority (assuming at least two data production will take place at the same time):
1 pp510 st_W (ready to go if not including MTD)
2 pp510 st_fms (fms gain calibration, pre-/post-shower alignment ~ will take quite a while)
3 AuAu54 st_physics (TPC/EMC/TOF/MTD calibrations >= 2 months)
4 pp510 st_physics (pp MTD calibration ~ 1-2 weeks ?)
5 pp510 st_mtd (pp MTD calibration ~ 1-2 weeks ?)
6 AuAu54 st_mtd (TPC/EMC/TOF/MTD calibration >= 2 months)
7 pp510 st_RP (RP calibration, vertex reconstruction ? )