Run 25 EMC timing: AuAu and etc.
Updated on Sun, 2025-06-15 14:39. Originally created by wwjacobs on 2025-06-15 14:15.
AuAu run 25:
from the files that Tonko posted for the Run 26160054 (cal_scan), the standard
offline analysis gives the following for phase settings:
BTOW (see attached spreadsheet for crate-by-crate values)
0x01-f: phase 120.6 ns
0x10-e: phase 120.2 ns
Average: phase 120.4 ns
ETOW (using standard procedure that optimizes pulse vs. gate):
phase 105 ns
Note: associated plots for both BTOW and ETOW attached below.
»
- wwjacobs's blog
- Login or register to post comments