JetCorr Follow-Up [09.24.2018] -- Closure Tests
Following up from the recent JetCorr weekly pwg meeting:
https://drupal.star.bnl.gov/STAR/blog/dmawxc/jetcorr-update-september-24th-2018
and from a previous post:
here are the closure tests for using the FF response to unfold the RFF spectrum, using the RFF response to unfold the RFF spectrum, and vice versa.
For the RFF vs. RFF unfolding and the FF vs. FF unfolding, the reason why the last bin (23 - 30 GeV/c) is off is because I forgot to turn off the "efficiency smoothing:" to mitigate statistical fluctuations in my calculation of the jet-matching efficiency, I set all bins above a set 'pTjet' (3 GeV/c) equal to their average. And for posterity, the FF vs. RFF unfolding is included below.
Groups:
- dmawxc's blog
- Login or register to post comments